Chapter 8. Servicing the PT878
200 Transport® Model PT878 Portable Liquid Flowmeter User’s Manual
8.12.2b Installing New Software (cont.)
2. The meter asks for confirmation. Repeat the options shown in Step 1
above. The screen on both the PC and the PT878 now appears similar to
Figure 134 below.
Figure 134: Flash Reloading Window
3. The meter now asks if you wish to reload the flash memory via the
infrared communications port.
Press [F3] (Yes) (or C on the PC keyboard) to begin reloading via
IrCOMM, or
Press [F2] (No) (or ESC on the keyboard) to stop the reloading
procedure.
4. Be sure the infrared sensor on the meter has a clear path to the infrared
adapter on the PC, and return to the PC Hyperterminal program.
GE Sensing PCI Loader
[HW Rev3+]
Reload Flash via Infrared (Yes/No)?
Backup Battery: OK
Firmware CRC: Valid
IrOBEX No IrCOMM
v3.0 2/26/03