Ge 49-80388 12-05 JR Uživatelský manuál Strana 22

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 72
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 21
22
OPTIONAL INSTALLATION:
REAR WALL VENTING
5 round duct may be used on SHORT DUCT
runs of 3 feet or less, such as direct to outside
wall venting.
To convert blower exhaust direction, remove
four nuts behind the filter which hold blower
and wire finger guard.
Rotate blower and reinstall to vent chamber,
as shown above. Retighten nuts, but do not
overtighten.
INSTALLING THE DUCTWORK
Use galvanized or aluminum duct in 6 round
or 3
1
4 x 10 size, or a combination of both.
PVC duct should be used if installing under a
poured concrete slab.
NOTE: Local building code must be followed
in specifying approved type and schedule of
ALL duct used.
Always use an appropriate roof or wall cap
with damper. Laundry-type wall caps should
NEVER be used.
Install ductwork, making male-female
connections in the direction of airflow as
shown. Secure all joints with sheet metal
screws and duct tape to assure an airtight
seal.
Use the shortest and straightest duct run
possible. For satisfactory performance the
duct run should not exceed 100 feet
equivalent length. Refer to TABLE 1 of
equivalent lengths. Use TABLE 1 to calculate
the total equivalent length of the ductwork.
Zobrazit stránku 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 71 72

Komentáře k této Příručce

Žádné komentáře